Friday, November 6, 2009

Day 40: Nov. 6, 2009

The rest of the concrete was poured today -- the sidewalk along Tamm, Arsenal, the driveway apron, and the final two piers for the stairs coming from the sunroom. In total, there was about 46 yards of concrete poured for the entire project over the past few weeks. It was rather cool to watch and I learned a lot. Tim Kopp (Kopp Concrete) are some really cool people.

The water garden was also dug out today. The hole is 10' wide by ~16' long and 3' deep. This will allow for a water garden that is 6' wide by ~12' long and 3' deep. We're hoping that tomorrow morning I don't wake to find a car parked in the hole. Heh.

The carpenters got the stairs installed as well as the french door. Although I had to show them how to install a deadbolt with a keypad -- technology!